On April 10, 2020, a Zhongrui Heavy Industry ZR500 mud purification system was successfully loaded and delivered to the construction site of the reserved civil construction project of the Jiangnan working well in the Qinwang Passageway in Fuyang, Hangzhou. When the equipment arrived at the site, the company's after-sales service personnel had arrived at the construction site at the same time to prepare for installation and commissioning. At present, the equipment installation and commissioning work is proceeding in an intense and orderly manner.
The ZR-500 mud purification system is mainly applicable to the mud purification and recovery treatment system of pile foundation engineering using mud wall protection and circulating drilling technology, ground connecting wall, mud water balance method shield construction and mud water pipe jacking construction. It is essential equipment for foundation construction to reduce construction costs and improve construction efficiency.
At the beginning of 2020, affected by the global new crown virus pneumonia, if the entire market is pressed the pause button, with the country’s strong prevention and control measures, epidemic prevention is not panic, and the economy is not stopping, all walks of life have quickly resumed work and production. With the support of the country’s vigorous development of infrastructure construction, we have ushered in new challenges and opportunities. The company’s profound technical strength and experience accumulated over the years will usher in a blowout development. In 2020, the company conforms to market development and demand, strengthens corporate resilience and judgment, gives full play to the effectiveness of the supply chain, and works together with customers. It is believed that the entire infrastructure industry will soon grow vigorously again.
公司簡(jiǎn)介
企業(yè)文化
榮譽(yù)資質(zhì)
發(fā)展歷程
總經(jīng)理致辭
社會(huì)責(zé)任
產(chǎn)品中心
動(dòng)畫演示
公司新聞
行業(yè)動(dòng)態(tài)
多媒體中心
售后服務(wù)
生產(chǎn)設(shè)備
電子樣本
營(yíng)銷網(wǎng)絡(luò)
人力資源
聯(lián)系我們
留言板